B2B · Documents for client submission · D-4

Agreement on pilot acceptance and stopping criteria

Draft · Before legal review · 2026-10-31

Before starting the paid pilot, set numerical criteria for “what counts as a pass and what triggers a stop.” This document alone governs the assessment. Complete 【 】 before signing.

1Periods and stages

StageDescriptionCost
Trial applicationApply through the implementation inquiry form · Try the demo support page or trial admin page yourself. Duration, allowance and start conditions are agreed in the consultation after application. This stage is outside this agreement's assessment.None
Paid pilotOperate a support page configured with your materials for actual customer inquiries for 30 days (launch on D1 through D30). We provide an interim report on D14.Basic operating fee waived (offer for the first 3 clients · 3 months from D1 · includes the 30-day pilot — quotation §3) · ₩300 per conversation only above the agreed monthly allowance · standard setup ₩0
Main contractIf the D30 assessment is a “pass” and you wish to proceed, continue with a monthly contract (no obligation to convert). Early conversion: if all acceptance thresholds have already been exceeded in the D14 interim report and you wish to proceed, the main contract can start that day (the remaining pilot period counts toward the first contract month · the basic fee waiver still ends 3 months from D1, so its end date does not change).Quotation (D-6)

2Definition of “one conversation” (for both billing and statistics)

3Acceptance criteria — All three must be met to pass

CriterionDefinitionPass threshold
A. Test question accuracyYour staff member asks and scores 20 representative questions selected by you (finalized before D1 and not changed afterward) using the admin page test. Correct = consistent with your materials with no key points missing. “Not in the materials, so refer to staff” is correct only when the question is outside the materials.≥ 80% (16/20)
B. Operational answer rateThe proportion of actual pilot conversations that AI completes without referring to staff (based on the admin page “Unresolved by AI” filter · test queries excluded).≥ 60%
C. Critical wrong answers Separate passing conditionAn answer to an end customer about refunds, prices or personal data that differs from your materials. One C incident means failure even if A and B meet their thresholds.0 incidents

Sample, scoring and error classification

4Stopping conditions

WhoWhenThen
Your companyAt any time (e.g. after the D14 interim report) · for any reasonThe support page closes that day. No termination penalty.
Your company · Our companyWhen a critical wrong answer (C) occursImmediately switch the support page to “Staff contact only” and provide the cause and proposed fix within 1 business day. Your company decides whether to resume.
Our companyWhen your materials violate the law or system-damaging use is confirmedSuspend after written notice (Terms of Use, Article 7).

5Settlement on failure or stopping

Your company
【Company name】 · Contact 【Name · Title】
Signature ______________
Our company
AlienPeoples · Representative Hyeoncheol Kim
Signature ______________

Pilot start date 【D1 = YYYY-MM-DD】 · Assessment date 【D30】